"VAD" Aquaculture Center Project. Situation
The "VAD"® Aquaculture Center is located in Peralejos de Abajo, a town in the province of Salamanca in the autonomous community of
Castilla and León. Spain.
Situation and Location
Peralejos de Abajo is located in the north-west of the province of Salamanca, very close to Vitigudino (5,5 km to the west) and to
Peralejos de Arriba (2,0 km to the east). The three, included in the region called CAMPO DE VITIGUDINO, belonging to the Judicial
Party of Vitigudino.
The "VAD"® Aquaculture Center is located in the Sector U.1 of the Industrial Estate of Peralejos de Abajo, complying
with the current regulations on industrial land use of the sector.
The detailed planning of the Sector U.1, is compatible with the
proposed use and activity and there are no incompatible conditions with industrial use. So, for all purposes the site can be considered
appropriate.
This industrial estate is located 0,5 Km, west of the town of Peralejos de Abajo and borders to the north with the C-517
regional road, Salamanca-Vega Terrón, which links the capital of the province with the header of the region. It is accessed at the
same, starting from the urban centre of Peralejos de Abajo, by the old road of Vitigudino, which crosses to the area of affection
from west to east on its south side, path that runs more or less parallel to the road C-517 and also, through the road C-517, at the
height of the P. K 62,300 by its left margin
Occupation and Current Status
The specific area of occupancy affected by the "VAD" Aquaculture Center comprises the industrial plots 2, 3, 4 and 5, covering a total
soil area of 5.329,52 m2. The Site formed by these 4 industrial plots is located on the grounds of the industrial estate of Sector
U.1, so they have all the urban services necessary for the development of the industrial activity of the Aquaculture Center "VAD"®
as they are:
- Urban Access : The access to the plots is paved.
- Supply or Connection of Sanitary Water : The drinking water comes
from catchment of the commonwealth, from which the town is supplied.
- Sanitation : There is a sewage conduit connected with
sewer, for the sanitary services of the plant and another water discharge duct from the plant, which after filtering will revert to
the sewage purifier from where it will be used for the Irrigation of green areas or agricultural areas.
- Electrical Power Supply
: The electricity supply is made from the medium voltage distribution line, with an internal transformation and distribution center
at 400/230 V.
The urbanization of the Aquaculture Center, affects an area of occupancy of 2.939,04 m2 of the total of 5.329,52
m2 of site, covering areas of roads, sidewalks, parking lots and facilities. The perimeter vials to the building for vehicle access,
pedestrian access and parking areas will be paved.
The rest of the external urbanization works will be carried out in the zones of
installations with tanks and storage reservoirs of water, sludge, gas, oxygen, various supplies, and shed for the accommodation of
the group of emergency generator and lighting outside. The conduits for the evacuation of rainwater and sewage will be installed.
At present, the promoter Viking Aquaculture Development Ltd has undertaken in the Site, cleaning works on the 5.329,52 m2 of the terrain,
excavation and transport of the vegetal land of this and perimeter fenced of the same one, necessary for the next start of construction
works of the Aquaculture Center.